Edward Pretious fonds - File List
« Back to fonds description
Box 1
Scrapbook. 1949-1962.
[Primarily of clippings related to the Fraser River Model].
Box 2
Fraser River Model. FRM reports.
FRM-201. Further exploratory tests on the effects of the closure of
Annacis Channel / E.D. Tharne. May 15, 1953.
FRM-202. Further tests an channel improvements through Steveston
Cut / E.D. Thorne, I.D. Smith. May 27, 1953.
FRM-203. Friction in hydraulic models involving non-uniform steady
flow in open channels / E.S. Pretious. June 22, 1953.
FRM-204. Friction in hydraulic models involving non-uniform unsteady
flow in open channels / E.S. Pretious. August 19, 1953.
FRM-205. A Stage verification for June 30, 1950, and probable
effects of proposed structures an these stages / E.S. Pretious, I.D.
Smith, E.D. Tharne. September 3, 1953.
FRM-206. Further studies of Ladner Bifurcation area / E.S. Pretious,
E.D. Thorne. October 27, 1953.
FRM-207. Further studies of the New Westminster Trifurcation Area /
E.S. Pretious, E.D. Tharne. November 30, 1953.
FRM-208. The Current-drag velocity meter / E.S. Pretious. June 22,
1954.
FRM-209. Model tests of local scour in the Vicinity of the partial
closure of Annacis Channel / E.S. Pretious, E.D. Tharne. July 29,
1954.
FRM-210. Further model studies of the effect an water levels at New
Westminster resulting from a structure in Annacis Channel / E.S.
Pretious, E.D. Tharne. August 6, 1954.
FRM-211. Design of thermistor water-velocity meter / E.S. Pretious,
I.D. Smith. August 25, 1954. 2 copies.
FRM-212. Fraser River Model channel reconstruction. December 10,
1954.
FRM-213. Further studies of Ladner Bifurcation Area E.D. Thorne.
December 17, 1954.
FRM-214. Part I: An Aspect of the sedimentation problem; Part II:
Flume studies / G.E. Jarlan. March 11, 1955.
FRM-215. Further model studies of the Ladner Bifurcation Area,
Fraser River / I.D. Smith. April 20, 1955.
FRM-216. Model verification studies in the New Westminster
Trifurcation Area / G.E. Jarlan. June 14, 1955.
FRM-217. The Design of pendulum-type velocity meter / I.D. Smith.
June 30, 19,55.
FRM-217 (Revised). December 6, 1960.
FRM-218. Modified Price Current Meter for measuring unsteady flow
velocities in open channels / I.D. Smith. July 18, 1955.
FRM-219. Amendments to "Operating instructions for the Fraser River
Model" (HY 109) and "Testing techniques for the Fraser River Model"
(HY 118). / E.S. Pretious, J.J. McGraw. Aug. 3, 1955.
FRM-220. 1955 Prototype studies of the lower Fraser River, B.C. / W.
Parkinson. September 9, 1955.
FRM-221. The Electrical wiring on the Fraser River Model / I.D.
Smith. September 27, 1955.
Box 3
Fraser River Model. FRM reports.
FRM-222. Model studies of improvement plans for the navigable
channel in the main arm of the Fraser River at New Westminster, B.C.
/ G.E. Jarlan. December 23, 1955.
FRM-223. Influence of proposed structures for the improvement of the
shipping channel at New Westminster on the local water stages / G.E.
Jarlan. January 30, 1956.
FRM-224. Bed-load movement in the main arm of the Fraser River
estuary / E.S. Pretious. March 28, 1956.
FRM-225. Hydraulic model studies of Steveston Cannery Channel / E.
Vollmer. July 25, 1956.
FRM-226. Sewerage outfall studies at Braid Street, New Westminster,
B.C. / E. Vollmer. October 16, 1956.
FRM-227. Part I: Plans for reduction of shoaling and for improvement
of the Fraser River at New Westminster, B.C. / E. Vollmer. June 13,
1957.
FRM-227. Part II: Plans for reduction of shoaling and for
improvement of the Fraser River at New Westminster, B.C. / E.
Vollmer. July 22, 1957.
FRM-227. Part III: Plans for reduction of shoaling and for
improvement of the Fraser River at New Westminster, B.C. / E.
Vollmer. April 23, 1958.
FRM-227. Part IV: Plans for reduction of shoaling and for
improvement of the Fraser River at New Westminster, B.C. / E.
Vollmer. August 14, 1959.
Box 4
Fraser River Model. FRM reports.
FRM-227. Part IV. Revised March 1, 1960.
FRM~228. Model studies to reduce dredging at Steveston Cut, Fraser
River, B.C. / E. Vollmer. July 30, 1958. Part A.
FRM-228, Part B. Preliminary model studies to reduce dredging and
improve navigation conditions from Steveston to the mouth of the
Fraser River, B.C. / E.S. Pretious, E. Vollmer. May 31, 1960.
FRM-229. Estimate of quantity rate of bed-load transport in the
Fraser River Estuary / E.S. Pretious. August 21, 1958.
FRM-230. Model tests to determine the effects of proposed dredging
by Fenco in the Port Mann-Sapperton Areas of the Fraser Fiver / E.
Vollmer. December 1, 1958.
FRM-231. Suggested glossary for river-training and harbour
development structures / E.S. Pretious. January 30, 1959.
FRM-232. Final report on plans for reduction of shoaling and for
improvement of the Fraser River at New Westminster, B.C. / E. S.
Pretious, E. Vollmer. October 23, 1959.
FRM-232 Revised. Revision and addendum to "Final report on plans for
reduction of shoaling and for improvement of the Fraser River at New
Westminster, B.C." / E.S. Pretious, J.E. Barlow. March 29, 1962.
Box 5
Fraser River Model. Reports and Memoranda.
Brief summary of principal features of model [Fraser River Model
Project] / Edward S. Pretious. November 14, 1955.
Laboratory flume studies, Deas Island Tunnel / E.S. Pretious, E.
Vollmer, A.C, Mercer. November 18, 1957. [Several articles,
memoranda, and reports related to the tunnel have been placed
inside].
Field trip from P.W.C. Wharf No.1 Road, Steveston, to Deas Island /
E. Vollmer, J.E. Barlow. September 19, 1957.
Fraser River Model, a joint project between the University of British
Columbia and the Department of Public Works, Canada: some facts
relating to the project and a summary of studies made / E.S.
Pretious. July 1961.
Final report on special observations of bed movement in lower Fraser
River at Ladner Reach during 1950 freshet and till June 1951.
Including supplementary report no. 1 to Memorandum re. special
observations, 1950 freshet / E.S. Pretious, T. Blench. Vancouver :
National Research Council, July 6, 1951.
Memorandum: Steveston Cannery Channel improvemnt studies / E.
Vollmer. June 5, 1956.
Memorandum report: Further model studies of improvement plans for the
navigable channel in the main arm of the Fraser River at New
Westminster, B.C. / E. Vollmer. January 25, 1957.
Memorandum: Fraser River Model tests, Deas Island Tunnel / E.S.
Pretious, E. Vollmer, A.G. Mercer. September 12, 1957.
Technical memorandum: Critical mean velocities of various grades of
sand as determined by flume studies / J.E. Barlow. March 29, 1962.
[Follow-up of Technical Note 30].
Principles of river training as an aid to navigation, with occasional
reference to the Fraser River, B.C. ; basic laws of river behaviour /
E.S. Pretious. (Technical report no. 5). July 22, 1960.
Wind-generated surface waves / E.S. Pretious. (Technical report no.
6). March 1962.
Progress reports / Fraser River Model. PR 1001-1094, 1953-1962.
Fraser River Model aids engineering studies of navigation
requirements / E.S. Pretious. December 28,1955.
Radii of bands, sand slopes. [Handwritten, n.d.].
Box 6
Fraser River Model. Technical notes and reports.
Technical notes nos. 1-29 [No. 29 is missing]. 1950-1951.
1. Note on modelling Pitt Lake.
2. Tentative calculations of Fraser River tidal celerities and
currents.
3. Proposal for training in practical sediment-transport
observations.
4. Puri siltometer, March 1951.
5. Proposal to construct a 400-foot-long flume for sediment-
transport experiments.
6. Scales for moving-bed models, March 1951.
7. Supplementary report no. 1 to memorandum re. special observations
1950 freshet, September 1950.
8. Memorandum covering modifications and test on control equipment,
Fraser River Model, October 1950.
9. Memorandum report an flume studies and bed movement of Fraser
River sand, November 1950, with supplement to February 1951.
10. Instructional manual for electronic control equipment.
11. An Analysis of the Fraser River Model tidal control.
12. Memorandum an sand grading and analysis.
13. Memorandum on a visit to United Kingdom Hydraulic Laboratories.
14. Memorandum on sands available for model bed.
15. Notes on mapping, template making and contour plots pertinent to
the Fraser River Model.
16. Preliminary investigations of tenmrature records on the Fraser
River.
17. Memorandum to supplementary report no. 1, special observations
1950 freshet.
18. Memorandum on survey data, discharge and gauge height
information available on the Fraser River.
19. River discharge and sand injection control equipment, and
appendix.
20. Revised instructional manual for electronic control equipment.
21. Discharge observations for tidal rivers.
22. Effects of varying tides on Fraser River stages.
23. Note on bed load for Fraser River Model.
24. Notes on studies of bed-sand movement in flumes, 19491951.
25. Preliminary survey of Fraser River (North Arm) bed sediment.
26. Second note on electric analogue for tides in estuaries.
27. Description of block diagram for control equipment.
28. Note on hunting of gates of Fraser River Model.
Critical mean velocities of various grades of sand and crushed coal
as determined by flume studies / G.E. Jarlan. (Technical note 30).
January 31, 1956.
Fitting curves to empirical data / E.S. Pretious. (Technical note
31). February 8, 1956.
Photography as a means of recording test data on the Freser River
Model / E. Vollmer, J.E. Barlow, M. Lindenberger. (Technical note
32). November 1957.
A New design for the tide and river discharge electronic control
equipment on the Fraser River Model / E.V. Bohn. (Technical note 33).
November 1958.
A Study of groins and their function as hydraulic structures / E.S.
Pretious, E. Vollmer. (Technical note 35). July 1961.
Items attached to technical note 35. [Correspondence, related
articles].
Water surface elevations and tidal discharges in the Fraser River
estuary, January 23 & 24, 1952 / W. Douglas Baines. (Report no. HY
104). Ottawa: National Research Council, April 8, 1952.
Report nos. HY 101-103, 105-114.
101. Preliminary model study of the proposed closure of Moray
Channel, Fraser River, B.C. / W. Douglas Baines. January 15, 1952.
102. A Discussion of "Distribution of sizes in river-bed sand
samples.." / W. Douglas Baines. January 22, 1952.
103. An Automatic recording tide gauge for the Fraser River Model
/ I.D. Smith. February 20, 1952.
105. A Brief summary of bed movement verification tests on Fraser
River Model / W. Douglas Baines. May 1, 1952.
106. Model study of proposed Stevestan Fishermen's harbour / W.
Douglas Baines. May 19, 1952.
107. Model scaling to Regime Formulae / T. Blench. August 13, 1952.
108. Model test on proposed Steveston Harbour breakwater / W.
Douglas Baines, E.D. Thorne. Sugust 26, 1952.
109. Operating instructions for the Fraser River Model / J.E.
Barlow. August 26, 1952.
110. The Analysis of friction in hydraulic models / W. Douglas
Baines. August 28, 1952.
111. A Brief report on controls and indicators of the Fraser River
Model / E.S. Pretious, I.D. Smith. August 18, 1952.
112. A Linearized solution to the problem of the tidal influence
of a wide river / G.V. Parkinson. September 19, 1952.
113. Preliminary model study of river training structures in the
Woodwards Landing Area / L.A. Neil, W. Douglas Baines. October 2,
1952.
114. Model tests an the Extension of Steveston south jetty no. 2
from jetty range 11 to jetty range 15 / W. Douglas Saines, E.D,
Thorne. November 21, 1952.
Report nos. HY 115-122.
115. Model tests ao channel improvements through Steveston Cut /
E.D. Thorne, W. Douglas Baines. December 12, 1952.
116. A Summary of further verification tests in the Woodwards
Landing Area / L.A. Neil. December 19, 1952.
117. Model verification and preliminary study of proposed channel
improvements, New Westminster Trifurcation Area / L.A. Neil.
December 22, 1952.
118. Testing techniques for the Fraser River Model / E.D. Tharne,
J.E. Barlow. March 9, 1953.
119. A Long period effect of tides an Fraser River Stages / W.
Douglas Baines. February 24, 1953.
120. Exploratory tests on the effects of the closure of Annacis
Channel / W. Douglas Baines, E.D. Tharne. March 10,1953.
121. A Continuous recording point gauge for the measurement of
surface waves / W. Douglas Baines, I.D. Smith. March 20, 1953.
122. Navigation problems in the North Arm of the Fraser River / W.
Douglas Baines. March 25, 1953.
The Fraser River Model: a brief general report an scope and progress /
E.S. Pretious. n.d.
Box 7
Fraser River Model Progress Reports
FRM Progress reports U.B.C. nos. 1-4, 1949
FRM Progress reports U.B.C. nos. 5-7, 1950-51
FRM Progress reports U.B.C. nos. 8-27, 1951-1953.
Map: Vancouver First Narrows before dredging. 1955.
Drawings to accompany Progress report U.B.C. no. 3.
Drawings to accompany Progress report U.B.C. no. 4.
Drawings to accompany Progress report U.B.C. no. 5.
Drawings to accompany Progress report U.B.C. no. 7 ( 2 copies).
Box 8
Fraser River Model and Vancouver Harbour Model
All publications prepared or issued by the Fraser River Model Office
from commencement of project up to and including March 1962.
Fraser River Model library list. September 1961.
Fraser River Model index to map filing system. [1961].
Filing system for maps and drawings. 1953.
Fraser River Model inventory. March 31, 1961.
A Brief outline of the Vancouver Harbour Project / E.S. Pretious.
1954.
Vancouver Harbour Model. Technical information. 1954.
Vancouver Harbour Model. Miscellaneous electrical diagrams. n.d.
Analysis of tides and currents in Burrard Inlet / W.D. Baines.
(Report no. MH-52). Ottawa: National Research Council, December 30,
1954.
Computation and analyses of Burrard Inlet Tidal Survey, May 3 to 6,
1954 / William Penhall Johnson. (Student Paper). November, 1954.
Vancouver Harbour and Burrard Inlet Model Project: correspondence,
1955-56, 1962.
Box 9
Vancouver Harbour & Burrard Inlet Model Project.
Vancouver Harbour & Burrard Inlet Model Project: correspondence,
1954.
Vancouver Harbour & Burrard Inlet Model Project: Correspondence,
1952-1953.
Newsclippings, notes. 1953.
National Harbours Board. Annual reports, 1950 & 1951.
Maps to accompany memoranda. n.d.
Note on Vancouver Harbour Model reports.
Vancouver Harbour Model. Interim report / L. Cox, I.D. Smith.
(VHM-IR 1). February 26, 1954.
Vancouver Harbour Model. Interim report / L. Cox. (VHM-IR 2).
November 25, 1954.
VHM-IR 2: Aerial view of Burrard Inlet (negative).
Vancouver Harbour Model. Report 1 / E.S. Pretious. (VHM-1). July
10, 1953.
Vancouver Harbour Model. Report 2 / E.S. Pretious, L. Cox. (VHM-2).
July 10, 1953.
Vancouver Harbour Model. Report 3 / I.D. Smith, L. Cox. (VHM-3).
January 7, 1954.
Vancouver Harbour Model. Report 4 / L. Cox. (VHM-4). April 7, 1954.
Vancouver Harbour Model. Report 5 / E.S. Pretious. (VHM-5). [April
1954].
VHM-5: Negatives of photos to accompany report.
Vancouver Harbour Model. Report 6 / L. Cox. (VHM-6). October 21,
1954.
Vancouver Harbour Model. Report 7 / L. Cox. (VHM-7). December 31,
1954.
Pamphlet bound, finished copies of:
VHM-IR l
VHM-IR 2
VHM-1
VHM-2
VHM-3
VHM-4
VHM-5
VHM-6
VHM-7
« Back to fonds description