Library Processing Centre

Location:
2206 East Mall
Date:
1979
2010 Renovations
Architect:
Toby, Russell, Buckwell
2010 Renovations: Kasian Architecture Interior Design and Planning
Cost:
$2,570,938
Sources of funds:
n/a
Architectural features:
This low profile building has a simple architectural style with painted steel spandrel walls. The building occupies approximately 30,000 sq. feet.
Construction Type:
Concrete
Name History
In 2010 the Library Processing Centre became the School of Population + Public Health Building.
Notes:
This is a two-storey building with basement. Another additional floor was added to the contracts.
Sources:
Community Relations; UBC Buildings (Campus Planning); UBC Properties Trust; UBC Calendar

Alphabetical Index | Chronological Index